Leave a Message
By providing your contact information to Annette Yorks Group, your personal information will be processed in accordance with Annette Yorks Group's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Annette Yorks Group in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Annette Yorks Group at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.
Thank you for your message. We will be in touch with you shortly.
Search Homes
Two well-kept detached homes beside an open late-autumn meadow, with bare trees and a soft wooded ridge in the background near Centre Hall, Pennsylvania.

What Centre Hall's Proposed 220-Home Neighborhood Is Waiting On

Just west of Homan Lane, a 113-acre parcel runs along Route 45 on the edge of Centre Hall. In July, S&A Homes brought two sketch plans for it to the Potter Township supervisors. Both showed 220 single-family homes under the name Mountain View Estates. The minutes show the project now depends on two things a buyer can follow: a pump station at the end of an existing sewer line, and a decision about how big the lots should be.

That matters to anyone comparing Centre Hall with Boalsburg or College Township this winter. A 220-home proposal can make a small town's housing supply look larger than it is. The July sketch plans are the most recent drawings of Mountain View Estates in the township's minutes. Centre Hall's new-construction choices today are the homes already standing and the one builder community already selling.

Two layouts for the same 220 homes

The July 20 supervisors' minutes describe both versions. The first has lots of about one-third of an acre. The minutes call it "similar in design to the Horizon at Brush Valley development," the existing neighborhood just outside the borough.

The second version puts the same 220 homes on lots about twenty percent smaller. S&A's representatives said this layout was meant to make the homes more affordable. The smaller lots would also leave larger blocks of shared open space and a wider buffer between the homes and the Grange Fairgrounds. The minutes compare it to Deerhaven in Walker Township. S&A Homes builds Deerhaven as ranch and two-story homes on homesites of about one-third of an acre.

The choice between the two decides what kind of house the neighborhood adds and roughly what it would cost. The one-third-acre version would add more homes like the ones already outside the borough. The smaller-lot version would add homes the developer itself pitched at a lower price, which would be a different product for Centre Hall. Both versions share the same sewer question.

The pump station at the end of the gravity line

When the supervisors asked about water and sewer capacity in July, S&A's representative said water capacity was sufficient. Sewer capacity was available too, but the existing gravity line "ends just short of the site," so a pump station would have to be built.

The Planning Commission minutes add detail. The developer would build the pump station for the Centre Hall-Potter Sewer Authority. A temporary pump station already serves the existing Centre Hall Associates neighborhood, and the minutes say it "would not be adequate" for the additional homes.

The township took up the question after that. At the September 9 supervisors' meeting, Chairman Roth proposed adding the township's sewer plants to a future agenda. He asked staff to look for grant funding and to contact the EADS Group, and he said the township needs to evaluate its sewer system "particularly in light of the sizable residential developments being proposed." The public works superintendent said he would arrange a site visit.

On September 21, the township's S&A Homes Project Committee held a kickoff meeting with representatives from water, the fire company, the Planning Commission and the supervisors. According to the September 21 minutes, the committee discussed a possible sewer extension. It also discussed a drivable walking path to the township park that could double as a second emergency entrance, water and natural gas connections to Penn's Prairie Park through the development, and having the homeowners association own the open space instead of the township.

Those items match the earlier Planning Commission notes. With only one entrance on State Route 45, the commission asked for emergency access and suggested a link to Penn's Prairie Park. The other items discussed were sidewalks along one side of the internal streets and along SR 45, a possible turning lane, a walking path through the open space, and S&A's standard landscaping of one shade tree per front yard. A buyer can treat these as a rough picture of the neighborhood if it is built. None of it has been approved.

The project appeared again under "Old Business" on the Planning Commission's November 10 agenda.

What Centre Hall's new construction looks like right now

Horizon at Brush Valley is the community the township minutes used as the comparison for the one-third-acre layout, and it is the one buyers can walk through today. Berks Homes builds it just outside Centre Hall. The builder offers seven floor plans with three to six bedrooms, two to four baths and two-car garages. Berks lists its Abbey plan in this community in the high $400s. Treat that as a published starting point for one plan, not a quote for every lot. The sales office is at 119 Buckwheat Way.

The community has been growing in stages for years. In 2019, the Centre Daily Times reported a 55-acre preliminary plan for 98 lots about half a mile east of the borough. A different builder was named on the project at that point. This summer, the Centre Hall Borough Council's July 9 agenda included water-service applications for 119 Buckwheat Way, 188 Heirloom Drive and 206 Heirloom Drive. The "Horizon at Brush Valley Phase 3 Subdivision Plan" was listed for discussion and action at the Potter Township supervisors' November 16 meeting.

So Centre Hall's new-home supply is growing in phases at one existing community while a much larger proposal goes through the early steps. If you want a brand-new home here in the coming year, Horizon is the place to look. If you want an established street close to the borough's center, you are shopping the resale market, and that is where the county numbers come in.

What the county numbers say about timing

The Centre County Association of REALTORS® publishes countywide figures, not Centre Hall figures, but the October 2026 report explains this winter's market. Active listings at the end of October 2026 totaled 299, 25.1% more than at the end of October 2025, or 2.6 months of supply. The report says the increase came from buyers pulling back. New purchase contracts in October 2026 were 6.2% lower than in October 2025, and showings were down 6.6%.

The homes that did sell still sold fast. The median time on market in October 2026 was 10 days, down from 22 in October 2025. The median sale price for the month was $382,200, up 9.4% from October 2025, and the median for 2026 through October was $392,500. Sellers received 97.0% of their original list price on average in October 2026.

Put that next to the Potter Township records. There are more homes to choose from countywide than a year ago, and buyers who move decisively have some room. Well-priced homes still go under contract in about a week and a half. A proposal whose latest drawings are sketch plans adds nothing to what you can buy this winter or spring. If you are holding out for a new Centre Hall neighborhood at a lower price, you are waiting on a pump station, a sewer-plant evaluation and a preliminary plan. Meanwhile, today's listings and the existing Horizon community keep selling.

The road that would change the commute math

The other long-range change is PennDOT's State College Area Connector. It is planned as an eight-mile, four-lane, limited-access highway between the Mount Nittany Expressway near Boalsburg and the limited-access stretch of US 322 at Potters Mills. PennDOT's project page, last updated in March 2026, shows the project in design, step two of four, with construction as the next step.

What to watch over the next few months

These steps in the public record will show whether the 220 homes are getting closer:

  1. A preliminary plan for Mountain View Estates goes to the Potter Township Planning Commission, replacing the sketch plans.
  2. One of the two layouts, one-third-acre lots or the smaller lots, becomes the plan S&A carries forward.
  3. The sewer-plant evaluation Chairman Roth asked for in September appears on a supervisors' agenda.
  4. A permanent pump station for the Centre Hall-Potter Sewer Authority shows up in a plan.
  5. Horizon at Brush Valley's Phase 3 moves through the township.

A few quick answers

Where does Mountain View Estates stand? The township reviewed sketch plans in July, and the project was listed under Old Business on the November 10 Planning Commission agenda.

Where would it be? On 113 acres along Route 45 just west of Homan Lane, with its only entrance on SR 45 and a possible walking and emergency connection to Penn's Prairie Park.

Where can I see new construction in Centre Hall today? At Horizon at Brush Valley, the Berks Homes community just outside the borough, with its sales office at 119 Buckwheat Way.

If you're weighing a home in Centre Hall against one closer to State College, Annette Yorks Group can walk you through the Centre Hall homes available now and what the township's next steps could mean for your timing. If you already own in Potter Township and want to know how today's quick sales apply to your home, start with a home valuation. Let's make your next move.

Follow Us On Instagram